Mendota, IL

Size, speed and complexity – all at once.

Project Details

Industry

Flour Mill

Construction Type

New Construction Design-Build, Heavy Industrial

Services Performed

Electrical Design, Installation and Automation

Labor

100% Self-Performed by KE

Project Duration

August 2017 – September 2019

Summary of Work Performed

The Situation

As one of the world’s oldest and largest agricultural processors, ADM owes its longevity to its ability to continuously improve. ADM placed its confidence in KE to deliver on this Mendota, IL, flour mill, which was the largest constructed at one time in the United States. The mill, as large as it is, also includes:

  • Three milling units with centralized monitoring to ensure performance, consistency and security of supply
  • Three bulk truck loadouts and rail load-out capability
  • A high-speed packer and a 30,000-square-foot warehouse
  • A brand-new lab with the most up-to-date quality control equipment
  • An onsite transportation company, including a truck wash and an advanced truck facility utilizing RFID technology to ensure efficiency and accuracy
The Solution

As the biggest KE project to date, the pressure was on to deliver. The facility sits on 140 acres and includes a loop track with 110-car shuttle rail unloading capacity.

Knobelsdorff provided engineering, design, procurement, installation, start-up and commissioning for:

  • Design-build engineering, procurement & construction
  • Complete engineering, design and 3-D modeling
  • 35 kV distribution system
  • 480-volt power distribution
  • Industrial Ethernet network
  • Process controls system
  • Facility lighting

We also provided engineering, design and installation for conduit and cabling for the process controls system; and we wired the lighting and emergency lighting system, fire alarm system, smoke detection, explosion detection and hazard monitoring setups.

The Result

The mill offers the most up-to-date monitoring and quality-control; swift and efficient packing and transportation options; and the ability to mill numerous wheat varieties. It accomplished everything ADM set out to achieve and more.

See More Work

Mason City, IA
Bushel Boy
A medium and high voltage installation for this new, high-tech 16.5-acre farm in Mason City, IA. KE helped save costs and put Bushel Boy in position to expand in the future.
Learn More
Cannon Falls, MN
Cannon Equipment
For more than 15 years, KE has been the go-to provider of engineering design support, control panel and motor control manufacturer for Cannon Equipment, always built to UL 508A and NEC standards.
Learn More
Zumbrota, MN
Dairy Farmers of America (DFA) Project
KE acted as the electrical contractor for a new build and complete plant overhaul for this manufacturer of dairy foods. We’re building on a 20-year relationship.
Learn More

Apply Today

When you join KE, you come first. We invest in the growth and happiness of our people, which in turn is an investment into the growth and happiness of our company. We grow as our people grow.
Join Our Family

Contact Us

Give us a call, drop us an email or stop on in. We’re always open.
Let's Talk
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram