Nautilus, Solar EPC

Minnesota

Collaborating with our partners to get things done.

Project Details

Owner

Nautilus Solar

Construction Type

New Construction Including Engineering, Procurement and Construction (EPC)

Utility

Xcel Energy

Labor

100% self-performed by KE

Project Duration

March 2019 - July 2020

Megawatts

21.20 MW DC

Total Modules

58,786

Summary of Work Performed

The Situation

In 2019, Knobelsdorff served as EPC contractor and completed four solar projects for Nautilus, totaling 21 MW DC in Minnesota. These renewable energy projects were located in Helen, Warsaw, Northfield, and Walcott, and they were all new construction. We used bifacial modules and single-axis trackers (one fixed tilt) at all sites, with a fixed-price contract for all.

The Solution

KE provided the mechanical, electrical, civil construction and commissioning services for these projects. Additional contractors and suppliers on the projects included Frattalone Companies, Grassland Solutions, Border States Electric, RP Construction Services and Ramy Turf.

Our Energy team is built on our company’s value of always doing the right thing for our customers and our people. Our people include our employees, their families, our customers, and our vendors. We have developed a strong relationship with preferred sub-contractors through numerous successful solar installations. These relationships proved to be crucial on the Northfield project, where we experienced an issue that could have potentially delayed the project by weeks. By collaborating with our trusted and valued partners, we quickly strategized and executed an efficient and safe solution.

The Result

KE has installed more than 400,000 kW of solar energy since 2017. Since the 2019 portfolio of projects, Nautilus has awarded KE with more than 46 MW of work, relating to planning, budgeting, engineering, procurement, construction, testing and commissioning. In 2019, KE was ranked #23 for solar contracting nationwide and #1 in Minnesota.

See More Work

Cannon Falls, MN
Cannon Equipment
For more than 15 years, KE has been the go-to provider of engineering design support, control panel and motor control manufacturer for Cannon Equipment, always built to UL 508A and NEC standards.
Learn More
Mendota, IL
ADM Mendota Case Study
This is the largest flour mill constructed at one time in the United States. KE provided engineering, design, procurement, installation, start-up, and commission for the project.
Learn More
Mason City, IA
Bushel Boy
A medium and high voltage installation for this new, high-tech 16.5-acre farm in Mason City, IA. KE helped save costs and put Bushel Boy in position to expand in the future.
Learn More

Apply Today

When you join KE, you come first. We invest in the growth and happiness of our people, which in turn is an investment into the growth and happiness of our company. We grow as our people grow.
Join Our Family

Contact Us

Give us a call, drop us an email or stop on in. We’re always open.
Let's Talk
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram