The Situation

US Solar sought a capable partner to support their first-ever installation of a utility-scale solar array integrated with an AC-coupled Battery Energy Storage System (BESS). The project required expertise in both renewable generation and energy storage systems. With a long-term power purchaser already identified—Missouri River Energy Services (MRES), the success of this initial installation was critical to building confidence in the technology, process, and partnership model. The goal was clear: deliver a high-performing renewable energy site, from design review through final commissioning, with minimal handoffs and full accountability.

The Solution

Knobelsdorff assembled a cross-divisional team from its Energy and Power Services divisions to take the project from engineering review to final commissioning. This integrated approach ensured seamless coordination across every stage of execution. Highlights of the work performed include:

Engineering and Planning

  • Conducted a collaborative engineering review in coordination with US Solar and Eneon, the BESS manufacturer, to ensure system compatibility and reliability from the outset.

Solar Installation

  • Delivered all critical phases of the solar scope including civil preparation, pile driving, underground electrical, racking, module placement, and full DC and AC wiring.
  • Managed and coordinated subcontractors to support civil and pile driving activities, maintaining schedule alignment and quality expectations.

BESS Installation and Commissioning

  • KE Power Services worked alongside Eneon and US Solar to integrate and commission the AC-coupled BESS, ensuring full system operability and site safety compliance.
  • Provided final commissioning support and validation for both solar and storage systems, delivering a complete energy solution under one roof.

Testimonial

"KE supported our Marshall, MN project with work that included complete mechanical and electrical installation scopes, and commissioning support. Their professionalism and expertise were key in meeting both schedule and budget without compromising quality or safety. KE’s continued support does not go unrecognized, and we are grateful for the committed partnership between KE and US Solar."

Luke Rehbein

Senior Project Manager at US Solar

The Results

The project met all commissioning milestones and was delivered successfully, resulting in a fully operational solar and storage facility. For US Solar, this marked a major milestone in expanding their energy portfolio with storage assets.

Customer Satisfaction and New Business

  • The long-term owner, MRES, expressed strong satisfaction with the completed site.
  • Based on the performance and execution of the Marshall project, MRES has since brought forward another development opportunity to US Solar—who then selected Knobelsdorff to perform
    the installation.

Demonstrated Cross-Divisional Strength

  • This project showcased the power of Knobelsdorff’s integrated model, allowing multiple service lines to work as one, delivering complex renewable energy infrastructure with precision and accountability.
  • From pre-construction through energization, Knobelsdorff proved its ability to serve as a single-source partner, reducing risk and driving value across the entire project lifecycle.
  • Knobelsdorff’s cohesive delivery model helped reinforce trust and lay the foundation for future partnerships.

Want to Learn How We’d Approach Your Project?

Get in touch to start the discussion.

See More Work

High-Volume Panel Production for Mission-Critical Infrastructure

Texas
See Case Study